Distributed Energy Storage Project for Henkel
In July 2018, Cubenergy installed a 500KW/1860kWh energy storage system for the Henkel production base within 6 hours of mechanical hoisting, installation, and commissioning. This system employs a 40ft. prefabricated container and S207 battery units, certified per the international standard of IEC62619. To effectively ensure the quality and safe use of electricity, Cubenergy has integrated two key functions, reverse power protection and islanding protection, in this project.
Voice of Customer
“Through the intelligent terminal management and flexible operation strategy of Cubenergy, the peak loads are effectively shifted, and our electricity expenses are significantly reduced.”
Power Operations & Maintenance Division, Henkel.
Energy Storage Project for Jiangsu Yinzhu Chemical Group
In April 2019, Cubenergy collaborated with EVE to deploy four sets of 500kW/1.8MWh distributed energy storage systems at the production base of Jiangsu Yinzhu Chemical. The total capacity stands at 2MW/7.2MWh. The systems employ the energy-storing 3.2V/90Ah batteries from EVE and smart cooling equipment. Additionally, Cubenergy installed sensing probes to each one of the batteries to ensure battery data collected to be more accurate. When launched, this system will maintain a
charge and discharge rate of 0.33C and will be able to supply power for 3.5 hours continuously for Yinzhu.
Voice of Customer
“In addition to safeguarding the smooth use of power, Cubenergy took on a turn-key delivery and helped us to install and connect the systems very quickly. This is a more sophisticated form of asset management.”
Head of Power Operations Division, Yinzhu.
Peak Load Regulation Project for Xinghua of Taizhou
This project was the largest user-side peak-load regulation project by means of an energy storage system in China with a capacity of 9.95MW/54MWh. It consisted of 20 sets of non-standard 40ft prefabricated energy storage systems, each set with a capacity of 500kW/2.7MWh . All of the systems employed the energy storage batteries with high energy density from Ganfeng Lithium, as well as optimized air ducts and two high-power precision air conditioners to offer an ideal operating environment for the system.
Voice of Customer
“Since its launch, the system has been running stably and safely. It has also brought us real returns on investments.”
Manufacturing Center, Jiangsu Shenyuan Group.